💬 Overview
As the economic is growing, many businesses have tendencies to invest in solutions that help reduce costs and increase economic benefits. One of the most popular solutions today is the solar energy system.
However, every investor and business will have their own needs when deploying a solar energy system, therefore, Ngan Long's services will be customized to meet clients' needs.
💬 There 2 main solutions:
🔹 Solution 1: Ngan Long will take over designing, constructing, installing the PV system (not include supplying equipments and solar panels)
🔹 Solution 2: Ngan Long conducts the whole system, including supplying equipments and solar panels.
Ngan Long always focuses on developing the team to meet customers' requirements on progress and quality of the project.
Up to now, Ngan Long has received the trust of many large enterprises such as:
DAI NAM JSC |
HCM City Power Corporation Subsidiary - Duyen Hai Thermal Power Company |
The Vu Company Limited |
Viet My Binh Dinh Production and Trading Co., LTD. |
Binh Dong Saigon Co., LTD |
CME Solar Investment JSC |
💬 Advantages:
🔹 2-3 years warranty for the whole project.
🔹 Equipment warranty according to the manufacturer's policy (10-12 years warranty for PV panels, over 80% capacity commitment for 25 years; 5-year warranty for inverter)
🔹 System monitor is provided.
🔹 Creating and enhancing the brand image of sustainable development for businesses. Because business and production are based on environmental protection, using alternative green energy helps businesses make a good impression on the public and improve their reputation with partners.
🔹 Saving on monthly electricity costs. Businesses always have to cope with rising and falling electricity prices and by investing in a solar power system, businesses can eliminate the burden on electricity costs.
🔹 It does not take much time to maintain the system. Solar power systems only need maintenance once a year to check and clean the panels to increase the efficiency and system lifespan.
💬 Process:
🔹 Step 1: Surveying the site, collecting input information
🔹 Step 2: Drawing designs, simulating output
🔹 Step 3: Preparing technical, commercial documents and implementation plan
🔹 Step 4: Signing an EPC/EP contract
🔹 Step 5: Deploying the project.